Sure we all have televisions in our units. Sure they all work (to a degree). The question has come up: Why do our televisions work the way they work and (more…)
It took a long time. A long time. And a screwdriver. But I finally figured out how to remove the screen in front of the window in the master bedroom. (more…)
The garages are set to be cleaned again. Oct. 19th – 9:00am to 5:00pm – upper level. Oct. 20th 9:00am to 5:00pm – lower level. This probably doesn’t need to (more…)
Tuesday morning the tiles on the 1st floor are going to be cleaned and sealed. Brian, the tile guy, will start work at 3 or 4 in the morning as (more…)
If you haven’t seen it, you just aren’t looking hard enough. A Picture of the Picture And it looks a whole lot like how we envisioned it, if I do (more…)
Flipping through the newspaper this morning and this caught my eye. If you are available, take a stroll over to Zeitgeist and find out what the city has to say. (more…)
Spiders eradicated – CHECK Sign peeled off glass (it was glued!) – CHECK Now the left, exterior door (as you enter from the street) has a pretty good squeak to (more…)
If you haven’t had an opportunity to see the tiles on the UL – and to preserve the process for all prosperity – here are some pictures. On your way (more…)
The tile work is (mostly) complete. We can walk on the tile as of 5:00pm today – Friday, September 10th. Brian, the tile guy, asked that we try to avoid (more…)
The tile that has been laid apparently needs to be washed again. We’re up to the fifth washing. Usually it only takes three. I chalk it up to it being (more…)
This is the latest information we have about the pump – from Ray, Director of Engineering: “We have replaced the water pump but the mixing valve will be rebuilt Friday (more…)
I cannot say definitively that the ordeal is over, but at about 6:45 am this fine Wednesday morning I found myself in hot water. It took some time for it (more…)
Things are going according to schedule on the UL. Again, thank you all for your patience and understanding during the process – especially after the cold-water weekend we are enduring. (more…)
Murphy’s Law: Anything that can go wrong, will go wrong. Our current lack of hot water was first caused by a malfunctioning mixing valve. That problem was solved and then (more…)
The hot water temeprature for the condos is down. Karen from the Sheraton is aware and indicated that the system was reset this morning – Friday the 3rd. The hot (more…)
Starting on September 6th (labor day) and lasting though the 9th the carpeting on the UL level will be ripped up and replaced with tile. This should prove to be (more…)
Good News! The construction for the sanitary sewer diversion has been delayed until 2011. I had spoke with Mike of MSA and Mark from the city and they had both (more…)
Before you ask, no, I do not know what is going on with the road closings. And, no, I couldn’t read that notice either – I mean, really, who wrote (more…)